Ashurst/Simmons & Simmons advise on BayWa r.e. sale to Encavis AG

Ashurst has advised BayWa r.e. on the sale of the Archidona solar power project to Encavis AG, who were advised by Simmons & Simmons

AshurstjpgAshurst has advised BayWa r.e., on the sale of the Archidona solar power project, to Encavis AG, amounting to 56.3 MW, located in Málaga (Spain).

BayWa r.e. is a leading global renewable energy developer, service provider, distributor and energy solutions provider. The company is based in 28 countries, with revenues of almost €2.5 billion. BayWa r.e. delivers end-to-end project solutions, ongoing operations management and is an independent power producer with an expanding energy trading business. The business has brought over 4 GW of renewable energy online, while managing over 10 GW of assets.

BayWa r.e. España started operating in 2010. Since then, it has developed, constructed, managed and promoted photovoltaic projects throughout the country.

This is the first time Encavis Asset Management has acquired a solar park in Spain. The Archidona solar park will save 25,600 tonnes of harmful CO2 after its completion and expected grid connection in March 2022.

The team from Ashurst was led by Corporate Energy partner Andrés Alfonso (pictured top left) and Corporate M&A senior associate, Isabel Matute (pictured top right) 

The team from Simmons & Simmons advising Encavis AG consisted of Juan Martínez Calvo (pictured bottom left) (partner), Juan Sosa Pons-Sorolla (pictured bottom right) (partner), Alfonso Martín (supervising associate) and Sara Moreno (supervising associate).

Michael Heron

SHARE